Newtown Canal Encasement Project
4 Documents in Project
Summary
SCH Number
2014122041
Lead Agency
Nevada Irrigation District
Document Title
Newtown Canal Encasement Project
Document Type
NOD - Notice of Determination
Received
Posted
11/20/2015
Present Land Use
Residential Agricultural
Document Description
The project will reroute all of the raw water flow within a 1,900-ft canal section into a pipe ranging from 30-in to 42-in that is planned to be constructed within or along Newton Road. The length of the pipe would be approximately 1,650 lf. This would require an inlet and outlet structure to divert water out of the canal and into the new pipeline and from the pipeline back into the canal. The existing canal section would not receive any water and NID would relinquish right-of-ways for this section of the existing canal to the individual property owners. Abandonment of the canal could include filling the existing canal with dirt or leaving the canal as-is.
Contact Information
Name
Adrian Schneider
Agency Name
Nevada Irrigation District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Nevada City
Counties
Nevada
Cross Streets
Justine Lane, White Oak Way, Beckville Road connected to Newtown Road
Zip
95959
Parcel #
04-131-46 through 04-490-10
State Highways
Hwy 49
Waterways
Deer Creek
Township
16N
Range
8E
Section
10
Base
MDB&M
Notice of Determination
Approving Agency
Nevada Irrigation District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.