Unit 2 Channel Improvements Project (Lake or Streambed Alteration Agreement No. 1600-2015-0165-R5)
3 Documents in Project
Summary
SCH Number
2014121082
Lead Agency
Santa Barbara County Flood Control District
Document Title
Unit 2 Channel Improvements Project (Lake or Streambed Alteration Agreement No. 1600-2015-0165-R5)
Document Type
NOD - Notice of Determination
Received
Posted
3/16/2017
Present Land Use
Flood Control Channel / AG-II-40
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2015-0165-R5, pursuant to section 1602 of the Fish and Game Code to the project applicant, Santa Barbara County Flood Control represented by Seth Shank.
Project is to increase the capacity of Unit 2 Channel in order to reduce the risk of the channel overtopping and the potential for property damage. Project components include: right-of-way acquisition for access, straightening the existing offset, increasing the channel bottom width, replacing and extending the width of the overflow weir, replace the existing 54-inch corrugated metal pipe (CMP) from the east channel, opening up an existing buried culvert, and adding a culvert within the existing Santa Maria River levee system.
Contact Information
Name
Sarah Rains
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Santa Maria
Counties
Santa Barbara
Cross Streets
Black Rd. and West Main St.
Zip
93458
Total Acres
7.89
Parcel #
117-020-058, 117-020-060, 117-160-
State Highways
Hwy 166
Railways
No
Airports
No
Schools
Bonita School
Waterways
Santa Maria River
Township
10
Range
34W
Section
6
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No