Grasslands Mitigation Bank Lift Pump (Streambed Alteration Agreement No. 1600-2014-0245-R4)

3 Documents in Project

Summary

SCH Number
2014121070
Lead Agency
Grassland Water District
Document Title
Grasslands Mitigation Bank Lift Pump (Streambed Alteration Agreement No. 1600-2014-0245-R4)
Document Type
NOD - Notice of Determination
Received
Posted
4/6/2015
Present Land Use
Agriculture
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement number 1600-2014-0245-R4, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Westervelt Ecological Services. The project is limited to installing a water intake on the western bank of Los Banos Creek to receive water deliveries for the Grasslands Mitigation Bank from the Central California Irrigation District and Grasslands Water District. The intake will consist of a pipe inlet and pre-fabricated concrete box riser, surrounded by rock slope protection. Concrete wingwalls may be installed on either side of the box riser. The pipe inlet will be installed below existing channel grade and a sump will be excavated in front of the inlet. The pump will be located outside of the creek.

Contact Information

Name
Dave Hacker
Agency Name
CDFW Central Region
Contact Types
Lead/Public Agency

Location

Cities
Los Banos
Counties
Merced
Cross Streets
Approximately 1.5 miles north of the intersection of China Camp Road and Sarbo Road
Total Acres
281
Parcel #
070-140-12, -32, -33, -36
Waterways
Los Banos Creek and Volta Wildlife Area
Township
9S
Range
10E
Section
20
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.