Road 23 Bridge Replacement at Dry Creek

3 Documents in Project

Summary

SCH Number
2014111062
Lead Agency
Madera County
Document Title
Road 23 Bridge Replacement at Dry Creek
Document Type
NOD - Notice of Determination
Received
Posted
1/27/2015
Present Land Use
Roadway Right of Way
Document Description
The existing concrete deck bridge on steel girders, pier, and abutments will be removed and replaced with a 43-foot wide by 80-foot long, precast concrete deck structure, supported by concrete abutments with precast concrete piles on either side of the creekbed. The project will require only minor modifications to the horizontal or vertical alignment of the existing roadway. The bridge will conform to the existing approach road width. The road will be closed during construction and traffic detour routes will be identified in the Project's Traffic Control Plan. The project footprint will be within the existing County right-of-way (ROW) and will not require acquisition of additional ROW.

Contact Information

Name
Larry Tonel
Agency Name
County of Madera, Public Works Dept
Contact Types
Lead/Public Agency

Location

Cities
Madera
Counties
Madera
Cross Streets
West of SR 99, approximately 0.5 miles south of Avenue 18 1/2
State Highways
Hwy 99
Railways
No
Airports
No
Schools
No
Waterways
Dry Creek
Township
7S
Range
21E
Section
14
Base
MDB&M

Notice of Determination

Approving Agency
Madera County Community & Economic Development
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print