Santa Anita Stormwater Flood Management and Seismic Strengthening Project
7 Documents in Project
Summary
SCH Number
2014101044
Lead Agency
Los Angeles County Flood Control District
Document Title
Santa Anita Stormwater Flood Management and Seismic Strengthening Project
Document Type
NOD - Notice of Determination
Received
Posted
2/14/2020
Document Description
The California Department of Fish and Wildlife (CDFW) has executed an amendment Lake and Streambed Alteration Agreement number 1600-2015-0155-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Los Angeles County Public Works. The project consists of the following tasks: 1) modify existing spillways; 2) construct a new pedestrian bridge and upgrade the existing hoist system; 3) modify existing inlet/outlet works; 4) repair the existing shotcrete on the downstream canyon walls and toe of the dam; 5) improvements to the ancillary facilities of the dam; and 6) replace existing potable water system. The spillway modification will include nighttime hours, over a 10-night period, from February 2020 to May 2020. Nighttime work will only be conducted in areas designated specifically in the amendment executed.
Contact Information
Name
Felicia Silva
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Los Angeles County Flood Control District
Contact Types
Project Applicant
Location
Counties
Los Angeles
Other Location Info
The project is located at Santa Anita Canyon Wash at the Santa Anita Dam and Reservoir, in the county of Los Angeles; and can be located using the following: Latitude 34.184064, Longitude -118.019255; Assessor's Parcel Number 8689-008-304.
Notice of Determination
Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No