Squaw Mountain Road Bridge Repair Project

4 Documents in Project

Summary

SCH Number
2014101018
Lead Agency
Riverside County Transportation Commission (RCTC)
Document Title
Squaw Mountain Road Bridge Repair Project
Document Type
NOD - Notice of Determination
Received
Posted
8/20/2015
Present Land Use
PLU: Existing Bridge Z: Scenic Highway Commerical GP: Commercial Tourist & Commercial Retail
Document Description
The Squaw Mountain Road Bridge Repair Project includes repair of the bridge by lining the channel bottom below the bridge with concrete, connecting the concrete-lined channel to the existing bridge abutments, placing 1/4 ton of riprap on the upstream and downstream sides of the concrete-lined portion of the channel and installing riprap slope protection on the northwest slope. An existing asphalt access road will also be extended approximately 40 ft. There is also a side tributary to Coldwater Wash that was previously realigned for the Painted Hills Development Project and was intended to flow adjacent to Squaw Mountain Road before entering the wash. As a result of significant degradation of the channel wash, the side channel has head cut back from the wash and is now eroding into the slope of Squaw Mountain Road and needs to be stabilized. The proposed repairs would consist of regrading the upper portion of the channel to the appropriate elevation, leaving this portion of the channel as a natural drainage. Flow would be directed to a basin before entering into a pipe that would outlet at the base of the slope in Coldwater Wash.

Contact Information

Name
Russell Williams
Agency Name
Riverside County
Contact Types
Lead/Public Agency

Location

Cities
Corona
Counties
Riverside
Cross Streets
Squaw Mountain Road and Temescal Canyon Road
Zip
92883
Total Acres
.94
Parcel #
290-050-030; 290-190-028 and 047
State Highways
I-15
Schools
Todd ES
Waterways
Temescal Wash, Coldwater Wash
Township
5S
Range
6W
Section
3

Notice of Determination

Approving Agency
Riverside County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print