Peju Persephone Ranch Vineyard Conversion and Water Rights
3 Documents in Project
Summary
SCH Number
2014092074
Lead Agency
Napa County
Document Title
Peju Persephone Ranch Vineyard Conversion and Water Rights
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2016
Present Land Use
LU: Agriculture
Z: Agricultural Watershed
LUD: Agriculture, Watershed & Open Space (AWOS) (APN 018-310-018), and Agricultural Resource (APN 018-310-022)
Document Description
The diversion to storage (appropriation) of up to 156.7 acre-feet of water from Burton Creek and 2 unnamed tributaries thereto, and approximately 78.5 acres of earthmoving and clearing activities of gently to moderately sloping annual grassland (+/-78.3 acres) and Oak woodland (+/-0.2acres) for the: i) construction of one new off stream water storage reservoir with a capacity of up to 73.2 acre ft; ii) enlargement of two existing on stream water storage reservoirs with a current capacity of 65 acre ft up to a total capacity of approximately 114.5 acre ft; and iii) the installation of erosion control measures and infrastructure associated with an approximate 69.4 acre vineyard development project (+/-51.1 net/planted acres). Typical slopes within the project area range from 3% to 29% with an average slope of 10.5%. The project applicant has prepared an Agricultural Erosion Control Plan (ECPA) as required by Napa County Code.
Contact Information
Name
Donald Barrella
Agency Name
Napa County
Contact Types
Lead/Public Agency
Phone
Location
Counties
Napa
Cross Streets
Howell Mountain Road and Chiles Pope Valley Road
Zip
94508
Total Acres
110
Parcel #
018-310-022 and -018
State Highways
No
Railways
No
Airports
Pope Valley
Schools
Pope Valley Union ES
Waterways
Burton Creek and several un-named blue line streams
Township
9N
Range
5W
Section
20
Base
MDB&M
Other Location Info
Angwin
Notice of Determination
Approving Agency
Napa County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.