I Street Bridge Replacement Project (T15136000)
4 Documents in Project
Summary
SCH Number
2014092069
Lead Agency
City of Sacramento
Document Title
I Street Bridge Replacement Project (T15136000)
Document Type
NOD - Notice of Determination
Received
Posted
7/2/2019
Document Description
The proposed project would construct a new bridge over the Sacramento River between Sacramento and West Sacramento to replace the vehicular crossing that is provided by the existing I Street Bridge. The project would facilitate vehicular and multimodal traffic over the river in order to reduce traffic congestion, improve safety, and remove a number of structurally deficient or functionally obsolete bridges that have reached the limit of their design life. While the existing I Street Bridge over the Sacramento River would remain in place and continue to be used for railroad operations, the approach structures leading up to the bridge from both directions would be demolished.
Contact Information
Name
Tom Buford
Agency Name
City of Sacramento
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Jesse Gothan
Contact Types
Project Applicant
Location
Cities
Sacramento, West Sacramento
Counties
Sacramento, Yolo
Other Location Info
The project is located over the Sacramento River between the cities of Sacramento and West Sacramento, approximately 1,000 feet north of the existing I Street Bridge. The total length of the project is approximately 0.42 mile (2,200 feet) along C Street and Railyards Boulevard.
Notice of Determination
Approving Agency
City of Sacramento, City Council
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes