Media Center Office Building Project
4 Documents in Project
Summary
SCH Number
2014081021
Lead Agency
City of El Monte
Document Title
Media Center Office Building Project
Document Type
NOD - Notice of Determination
Received
Posted
10/14/2014
Present Land Use
Professional Office Park - FAR 0.75
Z: Office Professional (OP)
Document Description
The overall project consists of the following phases: demolition of existing structures; construction of the new Media Center office building with a conference center; remodeling of one existing structure as a print shop; remodeling of a second structure for use as a warehouse; construction of the parking lot; construction of a Chinese Tea House and Gazebo; and construction of a new bridge across Rubio Wash to connect the site to Rosemead Boulevard. Once all facilities are constructed, the Media Center Office complex would contain approximately 98,088 square feet. An assembly area for the conference center would have a maximum occupancy to 250 persons. The City of El Monte entitlements required to implement the proposed project include the following: a Lot Division (Tentative Parcel Map) to consolidate four parcels into one parcel, a Conditional Use Permit (CUP) for a multiple-tenant development; Design Review for the building's architecture and site's conceptual landscaping; and a Modification to reduce the loading requirements. It is approval of these permits by the City that would allow the construction and operation of the proposed project to proceed.
Contact Information
Name
Jason Mikaelian
Agency Name
City of El Monte
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
El Monte
Counties
Los Angeles
Cross Streets
Rosemead Blvd (SH 19) and Garvey Avenue
Zip
91732
Total Acres
5.92
State Highways
Hwy 19
Waterways
Rubio Wash
Township
1S
Range
11W
Base
SBB&M
Notice of Determination
Approving Agency
City of El Monte
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.