North Coast System Rehabilitation Project

4 Documents in Project

Summary

SCH Number
2014072002
Lead Agency
City of Santa Cruz
Document Title
North Coast System Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
7/13/2015
Present Land Use
O-R (Parks, Recreation and Open Space) AG (Agriculture) R-M
Document Description
The project is limited to removal and replacement of a section of the 22-inch diameter north coast water delivery pipeline owned and operated by the City of Santa Cruz Water Department with new 24-inch diameter pipeline. The section of pipeline to be replaced consists primarily of 16- to 22-inch welded steel pipe that runs along Highway 1. The alignment of new pipeline will generally follow the alignment of the existing water main. The new alignment will be approximately 19,800 linear feet long with 18,500 linear feet of replaced pipeline. Approximately 90 percent of the proposed pipeline will be constructed employing standard open trench construction techniques. The remainder of the proposed pipeline will be built using a trenchless construction method such as horizontal directional drilling and jack and bore. Directional drilling methods will be used at the proposed crossing of Lombardi Gulch. A new 10-foot wide easement will be constructed along the pipeline alignment, which will permanently impact 125 linear feet of riparian forest and scrub habitat. Approximately 555 linear feet of riparian forest and scrub habitat within the existing 10-foot-wide easement that occurs along the existing pipeline will be restored. The California Department of Fish and Wildlife is executing a Lake and Streambed Alteration Agreement No. 1600-2014-0413 pursuant to section 1602 of the Fish and Game Code to the project Applicant, Rosemary Menard/ City of Santa Cruz Water Department.

Contact Information

Name
Melissa Farinha
Agency Name
CDFW Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
Highway 1 between Scaroni Road and the entrance to Wilder Ranch State Park
Total Acres
17.5
State Highways
Hwy 1
Railways
Santa Cruz Branch line
Airports
No
Schools
No
Waterways
Lombardi Gulch, Baldwin Creek, Old Dairy Gulch
Township
11
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A