North Coast System Rehabilitation Project

4 Documents in Project

Summary

SCH Number
2014072002
Lead Agency
City of Santa Cruz
Document Title
North Coast System Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
3/2/2015
Present Land Use
O-R (Parks, Recreation and Open Space) AG (Agriculture) R-M
Document Description
The City of Santa Cruz Water Department proposes to replace approximately 18,500 linear feet of 16 to 22 inch diameter raw water main that runs along Highway 1 in Santa Cruz County. The proposed project is Phase 3 (Coast Segment) of the North Coast System Rehabilitation Project (NCS). The Phase 3 segment is 19,800 feet in total length. The overall project will: 1) install/replace 18,500 feet of new pipeline; 2) use/retain 1,300 feet of existing pipeline; and 3) remove 800 feet of old, above ground pipeline. The majority of the proposed pipeline would be built using standard open trench construction techniques. The remainder would be built using a trenchless construction method such as horizontal direction drilling and jack and bore. These methods would be used at proposed crossings of Highway 1, Lombardi Gulch, and the Santa Cruz Branch rail line.

Contact Information

Name
Kevin Crossley
Agency Name
City of Santa Cruz Water Department
Contact Types
Lead/Public Agency

Location

Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
Highway 1 between Scaroni Road and the entrance to Wilder Ranch State Park
Total Acres
17.5
State Highways
Hwy 1
Railways
Santa Cruz Branch line
Airports
No
Schools
No
Waterways
Lombardi Gulch, Baldwin Creek, Old Dairy Gulch
Township
11
Base
MDB&M

Notice of Determination

Approving Agency
City of Santa Cruz
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print