Lancaster Energy Center (Lake or Streambed Alteration Agreement No. 1600-2015-0182-R5)
4 Documents in Project
Summary
SCH Number
2014071077
Lead Agency
City of Lancaster
Document Title
Lancaster Energy Center (Lake or Streambed Alteration Agreement No. 1600-2015-0182-R5)
Document Type
NOD - Notice of Determination
Received
Posted
5/19/2016
Present Land Use
General Plan: C, UR, NU
Z: Specific Plan and RR-2.5
LU: Vacant
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2015-0182-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Sustainable Power Group (Permittee), as represented by Mr. Garret Bean. The project is limited to the development of the construction and operation of a 150 MW solar electricity generating facility and up to two gen-tie lines that would feed power to one of two switching stations, ultimately connecting to a previously approved collector substation near 100th Street West and Ave. J, which will permanently impact 0.50 acre and temporarily impact 0.02 acre of ephemeral washes. The project will mitigate with the permanent protection and management of 1.02 acres of desert wash.
Contact Information
Name
Victoria Chau
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Cities
Lancaster
Counties
Los Angeles
Cross Streets
105th St W, 80th Street W, Avenue K, Ave L
Zip
93536
Total Acres
1191
Parcel #
various
Schools
Quartz Hill HS
Waterways
California Aqueduct
Township
7N
Range
13W
Section
varies
Base
SBB&M
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.