Rancho Coronado, (aka Heart of the City Specific Plan, aka P13-0062: SP 13-006/TSM 13-004/MND 14-001)

2 Documents in Project

Summary

SCH Number
2014069005
Lead Agency
City of San Marcos
Document Title
Rancho Coronado, (aka Heart of the City Specific Plan, aka P13-0062: SP 13-006/TSM 13-004/MND 14-001)
Document Type
NOD - Notice of Determination
Received
Posted
11/25/2015
Document Description
CDFW is intending to execute a lake and streambed alteration agreement pursuant to section 1602 of the fish and game code (#1600-2014-0071-R5) to the project applicant, Beazer East. The project proposes to alter the stream through grading to develop 52 acres of residential, 17 acres of non-residential mixed use commercial, and associated infrastructure improvements within the 251-acre property. Project activities will occur primarily in areas previously disturbed by Hanson Aggregate's former mining operation, and the majority of the undisturbed areas will be preserved in open space. The project includes relocating the primary drainage to the west of its existing location, creating a widened channel bottom and manufactured earthen slopes along both sides, and the construction of 2 soft bottom arch culvert crossings of the re-aligned channel to provide access to the future City of San Marcos park site. Riparian vegetation will be installed in the channel bottom, the riparian edge will be planted with coast live oak woodland, and the slopes will be planted with Diegan coastal sage scrub vegetation.

Contact Information

Name
Kelly Fisher
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
San Marcos
Counties
San Diego

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No