Smith Canal Gate Project [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2018-077-03 (ITP)]

11 Documents in Project

Summary

SCH Number
2014062079
Lead Agency
San Joaquin County Area Flood Control Agency
Document Title
Smith Canal Gate Project [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2018-077-03 (ITP)]
Document Type
NOD - Notice of Determination
Received
Posted
5/4/2020
Document Description
The project consists of construction, operation, and maintenance of a fixed wall with a gate structure near the mouth of Atherton Cove. The wall and gate structure will be built to isolate the adjacent neighborhoods from the 100-year floodplain and meet the Federal Emergency Management Agency's minimum acceptable level of performance of withstanding a 100-year flood, which is the regulatory standard specified by the National Flood Insurance Program. The Project will result in impacts on a total of 41.66 acres of Covered Species [Delta Smelt (Hypomesus transpacificus), Longfin Smelt (Spirinchus thaleichthys), and Chinook Salmon - Central Valley spring-run (Oncorhynchus tshawytscha)] habitat; the project will permanently remove 1.66 acres of Covered Species habitat. The project is expected to result in incidental take of Covered Species, which are designated as a threatened or endangered species under CESA. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

Contact Information

Name
Melissa Farinha
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
San Joaquin Area Flood Control Agency
Contact Types
Project Applicant

Location

Cities
Stockton
Counties
San Joaquin
Parcel #
109-02-006, 133-06-001, and 121-040-27
Other Location Info
The project is located at the mouth of Atherton Cove upstream to Smith Canal, a Perennial drainage and tributary to the San Joaquin River,

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes