Goleta Beach Park Bridge 51C-158 Replacement Project

3 Documents in Project

Summary

SCH Number
2014051081
Lead Agency
Santa Barbara County
Document Title
Goleta Beach Park Bridge 51C-158 Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2015
Present Land Use
Two-lane approach roads and access bridge / Recreation / Existing Public or Private Park, Recreation, and/or Open Space
Document Description
Santa Barbara County proposes to replace the existing structurally-deficient Goleta Beach Park Bridge with a new structure at an immediately adjacent location to correct existing structural defects and design deficiencies and ensure that vehicular access to Goleta Beach Park is maintained. The project also includes the realignment and connection to the Coastal Route bike path, development of a pull-out bus stop and pedestrian walkway along the bridge to the Park, construction of a new culvert near the bridge, and proposed habitat mitigation to improve/restore coastal habitat in the Country Lease - Public Agency Use through June 30, 2035, for the bridge and culvert construction and other existing facilities.

Contact Information

Name
Jennifer Lucchesi
Agency Name
CA State Lands Commission
Contact Types
Lead/Public Agency

Location

Cities
Goleta
Counties
Santa Barbara
Cross Streets
Sandspit Road / SR 217
Zip
93117
Total Acres
7.01
Parcel #
071-200-017; 071-200-013
State Highways
SR 217; Hwy 1
Railways
UPRR
Airports
Santa Barbara Municipal
Schools
UCSB; Isla Vista ES
Waterways
Goleta Slough; Pacific Ocean; UCSB Lagoon
Township
4N
Range
28W
Section
20
Base
SBB&M

Notice of Determination

Approving Agency
CA State Lands Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print