Orange Center School District Water Consolidation Project

4 Documents in Project

Summary

SCH Number
2014051033
Lead Agency
City of Fresno
Document Title
Orange Center School District Water Consolidation Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Roads right-of-way
Document Description
The City is proposing to construct, operate, and maintain approximately 2.8 miles of new water mains (pipelines) with associated connections to existing pipelines, tees, valves, and fire hydrants within the City of Fresno and unincorporated Fresno County. The City plans to construct 3,300 feet of 14-inch water main in S. Cherry Avenue from the current terminus of its water main, which is in the vicinity of Fresno Irrigation District (FID) North Central No. 26 canal, southward to the intersection with E. Central Avenue; 3,300 feet of 14-inch water main in S. East Avenue, from the current terminus of its water main, in the vicinity of FID's North Central No. 26 canal, southward to the intersection with E. Central Avenue; and 8,000 feet of 16-inch water main in E. Central Avenue from the intersection of S. Cherry Avenue eastward to connect with the City's existing water main in S. Cedar Avenue. Installation of these water pipelines would allow the Orange Center Elementary School to connect to the City of Fresno water system, allowing the school to replace its current use of bottled water and to cease using its on-site well (which would be abandoned). The project would also complete infrastructure improvements to ensure water system reliability and water service for properties along S. Cherry Avenue, E. Central Avenue, and S. East Avenue within the City's service area.

Contact Information

Name
Glenn Knapp
Agency Name
City of Fresno
Contact Types
Lead/Public Agency

Location

Cities
Fresno
Counties
Fresno
Cross Streets
South Cherry Avenue / East Central Aveneue / South East Avenue
Zip
93706
Parcel #
329-130-03T
State Highways
SR 99, 41
Railways
No
Airports
No
Schools
W Fresno
Waterways
No
Township
14S
Range
20E
Section
26-27
Base
MDB&M

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 6 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), Department of Water Resources, Office of Emergency Services, California, Resources Agency, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Water Facilities (Type Pipelines)
Local Actions
Other
Project Issues
Air Quality, Biological Resources, Geology/Soils, Noise, Transportation, GHG, Cultural, Utilities

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print