Santa Ana River Parkway - Geotech Boring Project (Lake or Streambed Alteration Agreement No. 1600-2019-0024-R5)
4 Documents in Project
Summary
SCH Number
2014051008
Lead Agency
Orange County
Document Title
Santa Ana River Parkway - Geotech Boring Project (Lake or Streambed Alteration Agreement No. 1600-2019-0024-R5)
Document Type
NOD - Notice of Determination
Received
Posted
7/30/2019
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2019-0024-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, County of Orange Public Works as represented by James Volz.
The project proposes to conduct a geotechnical study designed to evaluate subsurface soils and conditions for the proposed projects associated with the Santa Ana River Trail Project. The geotechnical field investigation includes excavating twenty-two (22) exploratory boreholes to investigate subsurface conditions and collect samples of in-situsoils. Exploratory boreholes are planned at the proposed bridge locations, near and along the retaining wall alignments, and at the proposed staging area.
Contact Information
Name
Eric Weiss
Agency Name
Department of Fish and Wildlife South Coast Region
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Yorba Linda
Counties
Orange
Other Location Info
The project is located within the City of Yorba Linda, County of Orange. The streambed alteration/construction within Santa Ana River Channel, a tributary to the Pacific Ocean.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes