North Valley Regional Recycled Water Program - Turlock Segment (California Endangered Species Act Incidental Take Permit No. 2081-2017-038-04 (ITP))
15 Documents in Project
Summary
SCH Number
2014042068
Lead Agency
City of Modesto
Document Title
North Valley Regional Recycled Water Program - Turlock Segment (California Endangered Species Act Incidental Take Permit No. 2081-2017-038-04 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
5/14/2018
Present Land Use
Agriculture
Document Description
Project involves installing a 38,700 foot pipeline to convey recycled water from the City of Turlock's Harding Drain Outfall Site to Modesto's Jennings Treatment Plant. At the Jennings Treatment Plant the pipeline will connect with the Modesto Segment of the North Valley Regional Recycled Water Program, which will convey the recycled water to the Delta Mendota Canal. The recycled water will be provided to the Del Puerto Water District service area and Central Valley Improvement Act-designated wildlife refuges. The pipeline will be installed using a combination of open-cut (trench) and trenchless (microtunneling) methods.
Project could result in the take of Swainson's hawk (Buteo swainsoni) in the form of mortality ("kill") due to vehicle strikes, nest abandonment, or impacts to nests resulting in the loss of young, hedglings, or eggs within .05 mile of the Project Area. Swainson's hawk is listed as threatened under CESA. Permittee will mitigate through the purchase of open-cut (trench) and trenchless (micro tunneling) methods.
Contact Information
Name
Annette Tenneboe
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Cities
Modesto, Patterson, Turlock
Counties
Stanislaus
Cross Streets
S. Carpenter Rd, W. Main St., Jennings Rd, Lemon Ave, Zacharias Rd, W. Marshall Rd, Pomegranate
State Highways
Hwy 33
Railways
CFNR
Waterways
San Joaquin River
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.