Purchase of Easement Interests in Real Property for the University Wash Storm Drain Stage 3.
3 Documents in Project
Summary
SCH Number
2014031054
Lead Agency
Riverside County Flood Control and Water Conservation
Document Title
Purchase of Easement Interests in Real Property for the University Wash Storm Drain Stage 3.
Document Type
NOD - Notice of Determination
Received
Posted
3/7/2016
Present Land Use
General Industrial and Industrial Business / Office Park; Zoned General Industrial and Industrial Business / Manufacturing Park
Document Description
The project consists of the acquisition of the permanent easements and temporary construction easement interests in real property for APNs 210-150-001 and 210-150-016. The project includes the removal of approximately 50 lineal feet of an old retaining wall, and hauling away debris generated from that removal. The project is part of a larger project, University Wash Channel Storm Drain, Stage 3, and was already evaluated pursuant to CEQA.
Contact Information
Name
Kris Flanigan
Agency Name
Riverside County Flood Control
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Riverside
Counties
Riverside
Cross Streets
Kansas Ave and Spruce Street; Massachusetts Ave and Durahart Street
Zip
92507
Total Acres
8.1
State Highways
SR 91 and 60
Airports
No
Waterways
Santa Ana River
Township
2S
Range
5W
Section
24
Base
SBB&M
Notice of Determination
Approving Agency
Riverside County Flood Control and Water Conservation District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.