Work Plan for Shoreline Slag Removal and Barrier Wall Feasibility Studies, Selby Slag Site
Summary
SCH Number
2013118132
Public Agency
Department of Toxic Substances Control
Document Title
Work Plan for Shoreline Slag Removal and Barrier Wall Feasibility Studies, Selby Slag Site
Document Type
NOE - Notice of Exemption
Received
Posted
11/18/2013
Document Description
The project is the approval of a work plan for evaluating the feasibility of removing shoreline and offshore slag, and the feasibility of installing a barrier wall along the northern shoreline of the Selby Slag Site (Site). The purpose of the project is to evaluate the feasibility of removing shoreline and intertidal slag (primarily the monolithic slag in the Ceneral Region), as well as to evaluate the physical and geotechnical conditons at the Site that will impact the design and alignment of a northern barrier wall.
Contact Information
Name
Jayantha Randeni
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Counties
Contra Costa
Other Location Info
Selby
Notice of Exemption
Exempt Status
Other
Type, Section or Code
15061 (b)(3)
Reasons for Exemption
It can be seen with certainty that there is no possibility that the activities in question will result in a significant effect on the environment.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.