Concurrence with the issuance of a new Solid Waste Facilities Permit (SWFP) for the Active Recycling Material Recovery Facility and Transfer Station in the City
7 Documents in Project
Summary
SCH Number
2013111058
Lead Agency
City of Los Angeles
Document Title
Concurrence with the issuance of a new Solid Waste Facilities Permit (SWFP) for the Active Recycling Material Recovery Facility and Transfer Station in the City
Document Type
NOD - Notice of Determination
Received
Posted
7/25/2014
Present Land Use
M-2 Light Industrial Zone/Light Manufacturing
Document Description
The proposed facility will be a large volume transfer/processing facility accepting municipal solid waste, green waste, and construction and demolition and inert debris and will operate within the following design/operation parameters: Hours of Operation - 6:00AM to 5:30PM Monday through Sunday; Maintenance Hours - 24 hours per day Monday through Sunday; Permitted Tonnage - 250 tons per day; and Permitted Area 0.56 acres. The facility is an existing recycling and buy-back center.
Contact Information
Name
Martin Perez
Agency Name
CalRecycle
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Gramercy Place and Wilton Place
Zip
90047
Total Acres
3.56
Parcel #
6001001001
State Highways
Rt 110
Railways
1
Schools
18
Township
2S
Range
14W
Section
23
Base
SBB&M
Notice of Determination
Approving Agency
CalRecycle
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.