Redwood Cluster Solar Project/Long Term Power Purchase Agreement with 65HK 8meLLC (Hayworth) for the Purchase of Solar Electricity

4 Documents in Project

Summary

SCH Number
2013101097
Lead Agency
Kern County
Document Title
Redwood Cluster Solar Project/Long Term Power Purchase Agreement with 65HK 8meLLC (Hayworth) for the Purchase of Solar Electricity
Document Type
NOD - Notice of Determination
Received
Posted
10/20/2014
Present Land Use
LU: Agriculture Z: A (Exclusive Agriculture), A-1 (Limited Agriculture) PGPD: Kern County General Plan: 8.1 (Intensive Agriculture), 8.4 (Mineral and Petroleum), 2.1 (Seismic Hazard); Metropolitan Bakersfield GP: R-IA (Resource-Intensive Agriculture)
Document Description
The Redwood Cluster Solar Project is a proposal to construct and operate six solar photovoltaic (PV) power generating facilities that would generate a combined 135 megawatts (MW) of electricity, on six sites. The facilities would operate year round and would generate electricity during daylight hours. Power generated from each site would be delivered from the site via a new generation tie line of up to 115kV, originating from an on-site substation and terminating at the Lamont Substation. Alternatively, power from the project sites would be delivered via new 34.5 kV overhead or underground lines to a new-offsite station near the Lamont Substation.

Contact Information

Name
Elena Lee
Agency Name
City of Palo Alto
Contact Types
Lead/Public Agency

Location

Cities
Arvin, Bakersfield, Lamont
Counties
Kern
Cross Streets
Tower Line Rd., Muller Rd; Tejon Hwy and Muller Rd; Comanche Dr. and Panama Ln.
Zip
93313
Total Acres
633
Parcel #
Multiple
State Highways
SR 58
Railways
SP RR
Airports
No
Schools
No
Waterways
Arvin-Edison Canal
Township
30S
Range
29,30E
Section
7,13,
Base
MDB&M
Other Information
Cont.: Section: 12, 23

Notice of Determination

Approving Agency
Kern County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print