Wilson Creek at Fremont Street Project (Streambed Alteration Agreement No. 1600-2014-0116-R6)

4 Documents in Project

Summary

SCH Number
2013101069
Lead Agency
City of Yucaipa
Document Title
Wilson Creek at Fremont Street Project (Streambed Alteration Agreement No. 1600-2014-0116-R6)
Document Type
NOD - Notice of Determination
Received
Posted
10/3/2017
Present Land Use
GPD: Institutional (Public) (IN), Residential (RS-20M); Rural Living (RL-1), Residential Z: Institutional (Public) (IN), Residential
Document Description
Project will consist o the removal of an existing low water crossing and the construction of a new culvert, roadway, and associated infrastructure in the same location. The existing 26-foot wide low water crossing will be removed and replaced with a 60-foot wide raised road consisting of a 44-foot wide roadway and additional improvements such as sidewalks and parkway. The 60-foot right of way will extend approx. 200 feet north and 600 feet south of the intersection of Wilson Creek and Fremont Street. Project activities within Wilson Creek will include the construction/installation of three - 14-foot wide 10-foot high reinforced concrete box culverts, wing walls, transition structures, and rip-rap slope protection. Project activities within Wilson Creek will extend approx. 300 feet west (downstream) and 600 feet east (upstream) of the road crossing, including the contouring of the streambed. Approx. 1,000 CY of import material will be used for the Street improvements.

Contact Information

Name
Kim Romich
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Yucaipa
Counties
San Bernardino
Cross Streets
Fremont Street, Casa Vista Street, Oak Glen Road, Pendleton Avenue, Highland Ave.
Waterways
Oak Glen Creek, Wilson Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print