Los Angeles River Water Wheel, Bending the River Back into the City Project (Lake or Streambed Alteration Agreement No. 1600-2019-0040-R5)

4 Documents in Project

Summary

SCH Number
2013101041
Lead Agency
City of Los Angeles
Document Title
Los Angeles River Water Wheel, Bending the River Back into the City Project (Lake or Streambed Alteration Agreement No. 1600-2019-0040-R5)
Document Type
NOD - Notice of Determination
Received
Posted
7/24/2019
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2019-0040-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Metabolic Studio as represented by Lauren Bon. The project proposes to construct and operate a 48-foot-diameter water wheel outside of the river channel to model after the historic water wheel as an aesthetic/educational statement. About 0.2 cfs of the diverted flows will be lifted by the water wheel to the adjacent ground surface for storage, treatment, and distribution for irrigation at State Historic Park, Albion Riverside Park, and Downey Recreation Center. Diverted flow will re-enter the channel 2,300 feet downstream from the diversion point.

Contact Information

Name
Audrey Kelly
Agency Name
Department of Fish and Wildlife South Coast Region
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles
Counties
Los Angeles
Other Location Info
The stream bed alteration/construction will be from within the Los Angeles River near 1745 North Spring Street and 1796 North Baker Street between the Broadway and Spring Street bridges.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes