Bending the River Back into the City
4 Documents in Project
Summary
SCH Number
2013101041
Lead Agency
City of Los Angeles
Document Title
Bending the River Back into the City
Document Type
NOD - Notice of Determination
Received
Posted
3/11/2014
Present Land Use
Public Facilities-PF-1XL and Open Space-OS-1XL
Document Description
The proposed project would involve construction and operation of a water wheel, loosely modeled after the historic wheel that existed near the project location and would include excavation of a 1,300 cubic yard pit and maintenance area for installation of the water wheel. It would also include construction of a side channel to the LA River, connecting the LA River to the water wheel pit and installation of an inflatable dam within the LA River channel, creating a water impoundment area upstream of the proposed inflatable dam. The purpose of the proposed project is to physically divert water from the LA River and create an aesthetic/educational statement, showing that the LA River can be used as a source of water.
Contact Information
Name
Jim Doty
Agency Name
City of Los Angeles, BOE
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Baker Street
Zip
90012
Total Acres
7
State Highways
Hwy 110
Railways
Amtrak
Airports
No
Schools
Cathedral HS
Waterways
Los Angeles River
Township
1S
Range
13W
Notice of Determination
Approving Agency
City Council of the City of Los Angeles
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.