Pit 3, 4, 5 Hat-Pit Confluence West Bank Project
Summary
SCH Number
2013098154
Public Agency
Regional Water Quality Control Board, Region 5 (Central Valley), Redding
Document Title
Pit 3, 4, 5 Hat-Pit Confluence West Bank Project
Document Type
NOE - Notice of Exemption
Received
Posted
9/12/2013
Document Description
The Pit 3, 4, 5 Hat-Pit Confluence West Bank Project consists of installing approximately 120 cubic yards and 100+/- linear feet of light (300 lb.) RSP along the west shoreline of Hat Creek, approximately 70' upstream from the Pit River, from two feet above the exposed edge of the existing metal reinforcement down two feet below the low water elevation (2,751 feet above mean sea level). No excavation or strippineg will be allowed at this site.
Contact Information
Name
Guy Chetelat
Agency Name
Regional Water Quality Control Board, Region 5 (Central Valley),
Contact Types
Lead/Public Agency
Phone
Location
Counties
Shasta
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15331
Reasons for Exemption
Projects limited to maintainence, repair, stabilization, rehabilitation, restoration, preservation, conservation or reconstruction of historical resources in a manner consistent witht he Secretary of the Interior's Standards for the Treatment of Historic Properties with Guidelines for Preserving, REhabilitating, Restoring, and Reconstructing Historic Buildings.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.