Concurrence in the Issuance of a Revised Solid Waste Facilities Permit for the City of Napa Materials Diversion Facility in Napa County, SWIS No. 28-AA-0030

6 Documents in Project

Summary

SCH Number
2013092036
Lead Agency
City of Napa
Document Title
Concurrence in the Issuance of a Revised Solid Waste Facilities Permit for the City of Napa Materials Diversion Facility in Napa County, SWIS No. 28-AA-0030
Document Type
NOD - Notice of Determination
Received
Posted
3/9/2015
Present Land Use
Materials Diversion Facility/Public Serving/Public-Quasi Public
Document Description
Revised Solid Waste Facilities Permit to allow the following design and operational changes: Receipt of food waste and co-collected food waste. Implementation of aerated static pile composting. An increase in operating hours for the composing operation from 8am to 5pm seven days per week to 24 hours per day, seven days per week. Increase storage capacity for composting operation from 60,000 cubic yards to 90,000 cubic yards. Combining the maximum vehicles per day limits from the existing permits for a revised maximum vehicles per day limit of 386.

Contact Information

Name
Nicholas Oliver
Agency Name
CalRecycle
Contact Types
Lead/Public Agency

Location

Cities
Napa
Counties
Napa
Cross Streets
Levitin Way, Tower Road and Devlin Road
Total Acres
18.6
Parcel #
57-110-49, 52, 65, 66, 67, 68
State Highways
Hwy 29 and 12
Railways
SPRR
Airports
Napa County
Waterways
Napa River
Township
5N
Range
4W
Base
MDB&M

Notice of Determination

Approving Agency
CalRecycle
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print