F.E. Weymouth Water Treatment Plant - Temporary Pipe Fabrication and Storage
Summary
SCH Number
2013088342
Public Agency
Metropolitan Water District of Southern California
Document Title
F.E. Weymouth Water Treatment Plant - Temporary Pipe Fabrication and Storage
Document Type
NOE - Notice of Exemption
Received
Posted
8/27/2013
Document Description
The Project proposes to construct a temporary pipe fabrication and storage area at the Weymouth plant. The work consists of removing the existing chain link fence that separates the storage area from the plant; grading the access road; and placing base material on the access road and storage area. The temporary fabrication and storage area dimensions would be approximately 270 feet x 240 feet. Work in the area consists of minor spot welding, pipe mortar-lining, and pipe storage.
Contact Information
Name
Brenda Marines
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency
Phone
Location
Counties
Los Angeles
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
S:15301,15304
Reasons for Exemption
Minor alteration to existing facilities.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.