South Midway Sunset Maricopa Gas Fuel Line (California Endangered Species Act Incidental Take Permit No. 2081-2017-045-04 (ITP))
1529 Documents in Project
Summary
SCH Number
2013081079
Lead Agency
Kern County
Document Title
South Midway Sunset Maricopa Gas Fuel Line (California Endangered Species Act Incidental Take Permit No. 2081-2017-045-04 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
5/30/2018
Present Land Use
Developed and Undeveloped land in Kern County. Current Zoning Classifications and General Plan Map Code Designations to remain the same.
Document Description
The project involves constructing a 4.35 mile under-ground 6-inch steel gas pipeline. Additionally, a "bull pen", which consists of a chain-link fence surrounding an above ground gas meter and relatively small section of pipe with supports, will be installed along a center portion of the pipeline and will tie in to the Chevron's existing fuel gas distribution system for the sale of gas fuel.
The project will result in permanent impacts to 4.9 acres and temporary impacts to 14.66 acres of habitat. The project is expected to result in incidental take of San Joaquin kit fox (Vulpes macrotis mutica) and San Joaquin antelope squirrel (Ammospermophilus nelson), which are designated as a threatened species under CESA. The ITP Referend above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of project implementation.
Contact Information
Name
Craig Bailey
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Counties
Kern
Zip
93560
Total Acres
3110 sq mi
Parcel #
Multiple
State Highways
Hwy 99, 58, 43, 46, 119, 223, 20
Railways
Multiple
Airports
Multiple
Schools
Multiple
Waterways
Kern River
Other Location Info
Tupman
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.