Talmage Road/Southbound U.S. 101 On-Off Ramps Realignment Project
4 Documents in Project
Summary
SCH Number
2013072057
Lead Agency
City of Ukiah
Document Title
Talmage Road/Southbound U.S. 101 On-Off Ramps Realignment Project
Document Type
NOD - Notice of Determination
Received
Posted
7/3/2015
Present Land Use
The current land use is "Street/Transportation." US 101 and Talmage Road Interchange
Document Description
The original project described in the DEIR was termed the "Loop Design," which involved removing the southbound off-ramp, widening the existing loop underneath the overpass and installing a traffic signal where the loop intersects with Talmage Road. However, the City Council approved the environmentally superior design favored by the Caltrans (Alterantive 2 in the EIR) that retains the southbound Highway 101 off-ramp to westbound Talmage Road. It would be widened to include two right-turn lanes as it approaches the Talmage Road intersection. This southbound off-ramp intersection with westbound Talmage Road would be signalized and realigned to the west to increase sight distance. The southbound Highway 101 off-ramp to eastbound Talmage Road would be realigned slightly controlling right turns if queues begin accumulating on either southbound off-ramps or along the left-turn lane onto the southbound Highway 101 on-ramp. Two dedicated left-turn lanes from Talmage Road to Airport Park Boulevard would also be provided.
Contact Information
Name
Charley Stump
Agency Name
City of Ukiah
Contact Types
Lead/Public Agency
Phone
Location
Cities
Ukiah
Counties
Mendocino
Cross Streets
Talmage Road, Highway 101
Zip
95482
State Highways
Hwy 101
Railways
NWP
Airports
Ukiah Municipal
Waterways
Russian River and local creeks
Notice of Determination
Approving Agency
City of Ukiah
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.