STPUD Angora Creek Sewer Relocation Project

3 Documents in Project

Summary

SCH Number
2013072054
Lead Agency
South Tahoe Public Utility District
Document Title
STPUD Angora Creek Sewer Relocation Project
Document Type
NOD - Notice of Determination
Received
Posted
8/29/2013
Present Land Use
Residential and Conservation
Document Description
The Angora Creek Sewer Relocation Project (Project) proposes to replace and realign an 8-inch sewer line crossing Angora Creek that is at significant risk of structural failure, the consequences of which could include: sudden loss of sewer service to residents in Angora Highlands; significant risk to water quality in Angora Creek; and sudden sewer surcharges downstream of the sewer line failure. The project installs a gravity flow sanitary sewer realignment that will be constructed from a manhole on the corner of Mountain Trout Drive and Clear View Drive, spanning to a downstream manhole located on the north side of the Angora Creek, approximately 330 feeet south of the southwest terminus of Mountain Trout Drive. A total of approximately 638 linear feet of 8-inch piping and two new manholes will be installed. Construction of the new gravity sewer collection main will follow for elimination of the exposed 8-inch sewer line crossing Angora Creek. The existing line that crosses Angora Creek will be abandoned in-place without disturbance to the creek channel and SEZ.

Contact Information

Name
John Thiel
Agency Name
South Tahoe Public Utility District
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
Mountain Trout Drive and Clear View Drive
Zip
96150
Total Acres
.5
Parcel #
033-020-03
State Highways
US 50
Railways
No
Airports
No
Schools
No
Waterways
Angora Creek and Upper Truckee River
Township
12N
Range
18E
Section
19
Base
MDB&M
Other Location Info
Meyers

Notice of Determination

Approving Agency
South Tahoe Public Utility District Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No