Chisnantuck and Rancho San Vicente Trail Construction Project

3 Documents in Project

Summary

SCH Number
2013072023
Lead Agency
Santa Clara County
Document Title
Chisnantuck and Rancho San Vicente Trail Construction Project
Document Type
NOD - Notice of Determination
Received
Posted
3/10/2016
Present Land Use
Regional Park; County: A; A H: A HS-sr, Regional Park, Existing; City: R-1-1, Open Hillside
Document Description
The project is limited to the construction of two new park trails, the Chisnantuck Trail and Ranch San Vicente Trail. The Chisnantuck Trail will be an approximately 4.1 mile single-track, natural surface multi-use trail 5 ft in width. The trail calls for 15 rock-armored swales within mixed bay/oak woodland. The Rancho San Vicente Trail will be an approximately 4 mile single-track, natural surface multi-use trail. The trail calls for 16 rock-armored swales within annual grassland. The armored swales will be trail and drainage width to ensure the water remains in the channel, and armored throughout the trail width. No mortar will be used in construction of swales within annual grassland. The armored swales will be trail and drainage width to ensure the water remains in the channel, and armored throughout the trail width. No mortar will be used in construction of swale crossings. Swales will be armored with large rocks at the base to make up the keystone/foundation and then smaller rocks will make up the tread for multi-use passage and energy dissipation. Rocks will be sourced from nearby on each site. The drainages being crossed do not flow frequently (flow is primarily short duration during peak storm periods). The trails have been located to avoid the need to remove trees. CDFW is executing a lake and streambed alteration agreement no. 1600-2015-0384-R3 pursuant to section 1602 of the fish and game code to the project applicant, Robb Courtney, County of Santa Clara, Department of Parks and Recreation.

Contact Information

Name
Melissa Farinha
Agency Name
CDFW Bay Delta
Contact Types
Lead/Public Agency

Location

Cities
San Jose
Counties
Santa Clara
Cross Streets
Entrance at 23205 McKean Road, approximately 3 miles SW of U.S. Hwy 101
Zip
95037
Total Acres
4442
State Highways
Hwy 101
Waterways
Calero Reservoir

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print