State Route 168 Sidewalks

3 Documents in Project

Summary

SCH Number
2013071089
Lead Agency
California Department of Transportation, District 9
Document Title
State Route 168 Sidewalks
Document Type
NOD - Notice of Determination
Received
Posted
9/5/2013
Present Land Use
State Highway
Document Description
Caltrans proposes to construct curb, gutter, and sidewalks within the highway right-of-way of SR 168 (West Line Street) within the unincorporated area of Inyo County, CA, between the PM 16.79 to 17.54. The sidewalk will be constructed along the north side of the highway from Barlow Lane (PM 16.79) to 0.2 mile east of See Vee Lane near the Bishop Care Center and the boundary of the City of Bishop (PM 17.54). The project proposes to construct a 6 foot wide sidewalk with curb from Barlow Lane to 0.1 mile west of Pioneer Lane. Paved shoulder width would be 8 feet wide for approximately 0.6 mile, from Barlow Lane to 0.1 mile east of See Vee Lane, and 13 feet wide for the remaining 0.1 mile to the end of the project.

Contact Information

Name
Mark Heckman
Agency Name
California Department of Transportation, District 9
Contact Types
Lead/Public Agency

Location

Cities
Bishop
Counties
Inyo
Cross Streets
State Route 168 / Barlow Lane, Tu Su Lane, See Vee Lane
Zip
93514
Parcel #
Various
State Highways
Hwy 168
Railways
No
Airports
No
Schools
Bishop USD
Waterways
No

Notice of Determination

Approving Agency
Caltrans #9
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print