Jordan High School Major Renovation Project

3 Documents in Project

Summary

SCH Number
2013071073
Lead Agency
Long Beach Unified School District
Document Title
Jordan High School Major Renovation Project
Document Type
NOD - Notice of Determination
Received
Posted
11/20/2013
Present Land Use
Existing school / I (Institutional zoning / Land Use District 10, Institutional, and School District under General Plan
Document Description
Implementation of campus master plan in approximately six phases starting in January 2014 ending in 2028 (dependent on funding). Project includes demolition of approximately 10 permanent buildings and 32 portable buildings, renovation of approximately 213,000 sf of existing building space, and construction of approximately 240,000 sf of new building space, to replace the classrooms that were demolished. At full buildout, the project site would consist of approximately 453,000 sf of total building space. The number of classrooms would decrease from 131 to 129 with a total maximum student capacity of 3,870. Capacity would decrease with the proposed project and there would be no change to enrollment. All phases of the proposed project would be contained within the existing boundaries of the school site.

Contact Information

Name
Tom Rizzuti
Agency Name
Long Beach Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Long Beach
Counties
Los Angeles
Cross Streets
Atlantic Avenue and Artesia Boulevard
Zip
90805
Total Acres
26.9
Parcel #
7115-025-900
State Highways
Hwy 91, 710
Schools
Hamilton MS, Grant ES
Waterways
Los Angeles River

Notice of Determination

Approving Agency
Long Beach Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print