Curtis Landing Fish Release Site Improvements Project

7 Documents in Project

Summary

SCH Number
2013062018
Lead Agency
California Department of Water Resources (DWR)
Document Title
Curtis Landing Fish Release Site Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
10/7/2013
Present Land Use
Currently used as a fish release site and levee road, zoning is Agricultural-80 Acres and General Plan Designation is Recreation
Document Description
The Curtis Landing Fish Release Site Improvements Project includes demolishing the existing fish release system and existing site access gate; removing wood piles within 50 feet upstream of the existing release pipe; raising and re-grading the adjacent levee road; installing a reinforced concrete operation pad on top of the levee crown; constructing a concrete wall, for replacement of rip-rap; replacing the fish release system; installing an automated site access gate; and modifying existing electrical power systems and site lighting. The CA Dept. of Fish and Wildlife is executing a Streambed Alteration Agreement Number 1600-2013-0234-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Katherine Kelly, Chief Bay Delta Office, Department of Water Resources.

Contact Information

Name
Eva Olin
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Cities
Rio Vista
Counties
Sacramento
Cross Streets
Near intersection of Sherman Island East Levee Road and Sherman Island Levee Road
Zip
94571
Total Acres
2.54
Parcel #
158-070-048
State Highways
Hwy 160
Waterways
San Joaquin River
Township
2N
Range
2E
Section
10
Base
MDB&M

Notice of Determination

Approving Agency
Calfiornia Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print