Curtis Landing Fish Release Site Improvements Project
7 Documents in Project
Summary
SCH Number
2013062018
Lead Agency
California Department of Water Resources
(DWR)
Document Title
Curtis Landing Fish Release Site Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
8/12/2013
Present Land Use
Currently used as a fish release site and levee road, zoning is Agricultural-80 Acres and General Plan Designation is Recreation
Document Description
The Curtis Landing Fish Release Site Improvements Project includes demolishing the existing fish release system and existing site access gate; removing wood piles within 50 feet upstream of the existing release pipe; raising and re-grading the adjacent levee road; installing a reinforced concrete operation pad on top of the levee crown; constructing a concrete wall, for replacement of rip-rap; replacing the fish release system; installing an automated site access gate; and modifying existing electrical power systems and site lighting.
Contact Information
Name
Kathleen Buchnoff
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Rio Vista
Counties
Sacramento
Cross Streets
Near intersection of Sherman Island East Levee Road and Sherman Island Levee Road
Zip
94571
Total Acres
2.54
Parcel #
158-070-048
State Highways
Hwy 160
Waterways
San Joaquin River
Township
2N
Range
2E
Section
10
Base
MDB&M
Notice of Determination
Approving Agency
California Department of Water Resources
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.