Teviston South Well Replacement Project Feasibility Study and Test Well
Summary
SCH Number
2013058006
Public Agency
Teviston Community Services District
Document Title
Teviston South Well Replacement Project Feasibility Study and Test Well
Document Type
NOE - Notice of Exemption
Received
Posted
5/1/2013
Document Description
Nature: Evaluate, plan and design water system improvements for the TCSD to replace capacity lost from South Well.
Purpose: Provide an adequate safe water supply that meets Federal and State Safe Drinking Water Standards.
Beneficiaries: Teviston water system users will benefit.
Contact Information
Name
Frank Galaviz
Agency Name
Teviston Community Services District
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Tulare
Township
23S
Range
25E
Section
9,16
Base
MDB&M
Other Location Info
Teviston (unincorporated)
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Sect. 15306
Reasons for Exemption
Cont: Statutory Exemption: Sec. 15262
The proposed planning project will evaluate, plan and design water system improvements for the Teviston Community Services District and drill a test well. Based on the environmental and economic analyses conducted during this planning, a future CEQA document will be needed to undertake construction of water system improvements.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.