Lake or Streambed Alteration Agreement No. 1600-2012-0270-R1 for Noindustrial Timber Management Plan (NTMP) 1-99 NTMP-039 MEN, "Perry Gulch Ranch"

Summary

SCH Number
2013049003
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Lake or Streambed Alteration Agreement No. 1600-2012-0270-R1 for Noindustrial Timber Management Plan (NTMP) 1-99 NTMP-039 MEN, "Perry Gulch Ranch"
Document Type
NOD - Notice of Determination
Received
Posted
4/9/2013
Document Description
The California Department of Fish and Game (DFG) are entering into a lake or streambed alteration agreement (Agreement) with Mr. Michael Howell, representing The Perry Gulch Ranch. The two activities to be completed according to the Agreement are located approximately one mile south of the town of Navarro - on Highway 128 - in Mendocino County. The project is located on Perry Gulch and Gulch 6, which is tributary to the Navarro River in Mendocino County. The project's activities covered by this Agreement are located in Section 19; Township 15N; Range 15W, and Section 25; Township 15N; Range 16W in the Navarro U.S. Geological Survey 7.5-minute quadrangle; Mount Diablo Base and Meridian.

Contact Information

Name
Department of Fish and Wildlife
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Counties
Mendocino

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print