Tahoma Meadows Mutual Water Co. Transmission Pipeline Project - Phase 2

2 Documents in Project

Summary

SCH Number
2013042046
Lead Agency
Tahoe City Public Utility District
Document Title
Tahoma Meadows Mutual Water Co. Transmission Pipeline Project - Phase 2
Document Type
NOD - Notice of Determination
Received
Posted
5/23/2013
Present Land Use
156 Chambers Landing / Chamberland Residential
Document Description
The project will involve the construction of approximately 1725 ft of new 10-inch water pipeline that will connect the existing Tahoe City Public Utility District water distribution system to the existing distribution system of Tahoma Meadows Mutual Water Company. The project will allow Tahoe City Public Utility District to take over operation and ownership of the Tahoma Meadows water system. The project will assure provision of a safe and reliable source of drinking water in compliance with State Department of Public Health Standards defined in Title 22.

Contact Information

Name
Coral R. Taylor
Agency Name
Tahoe City Public Utility District
Contact Types
Lead/Public Agency

Location

Counties
Placer
Cross Streets
Crystal Court, McKinney Creek Road, Cascade Drive, Woodside Drive
Zip
96142
Total Acres
.65
State Highways
Hwy 89
Waterways
McKinney Creek, Lake Tahoe
Township
14N
Range
17E
Section
18
Base
MDB&M
Other Location Info
Tahoma

Notice of Determination

Approving Agency
Tahoe City Public Utility District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print