Jacob Lane Reach C Kinder-Morgan Pipeline Location Confimation
Summary
SCH Number
2013038483
Public Agency
Central Valley Flood Protection Board
Document Title
Jacob Lane Reach C Kinder-Morgan Pipeline Location Confimation
Document Type
NOE - Notice of Exemption
Received
Posted
4/9/2013
Document Description
The project is required to determine the depth and location of a Kinder-Morgan petroleum distribution that is no longer in service. The potholing will be performed by excavating 33 trenches using a backhole. An additional 51 explorations will be conducted using a hydorovac mechanism. Spent water and soil will be disposed of offsite. The trenches will be no more than nine feet long, two to three feet wide and at a maximum depth of 10 feet. No trenches will be left open overnight. All excavated soil will be stockpiled adjacent to the trench and backfilled at the end of the day. No woody vegetation will be removed. Some tree roots may need to be cut near the Sheiff's facility during the trenching and will be monitored by the biologist. Erosion protection will be utilized and the area will be reseeded. The project will take place in April.
Contact Information
Name
Mary Ann Hadden
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency
Phone
Location
Counties
Sacramento
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
S:15304
Reasons for Exemption
Minor alteration to land.