Pensco Trust Special Permit for Bridge Construction and Riparian Vegetation Removal

2 Documents in Project

Summary

SCH Number
2013032080
Lead Agency
Humboldt County
Document Title
Pensco Trust Special Permit for Bridge Construction and Riparian Vegetation Removal
Document Type
NOD - Notice of Determination
Received
Posted
5/13/2013
Present Land Use
Z: Timber Production Zone LUD: Timber under the Framework GP: Parcel is currently vacant.
Document Description
A Special Permit for after the fact road and bridge work within a streamside management area and vegetation clearing within a streamside management area, wetland and wetland buffer. Two bridge crossings of a perennial watercourse have been reconstructed. Concrete abutments were hand dug, formed and poured. Rip-Rap has been placed under the bridges. At this time the applicant proposes to move the northwestern bridge abutment 10 feet to the east to improve the approach. A small spring located just above the road prism was channelized in a 10" diameter pipe.

Contact Information

Name
Beth Burks
Agency Name
Humboldt County
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Friday Ridge Road
Zip
95573
Total Acres
5
Parcel #
524-152-002, 524-145-003
State Highways
Hwy 299
Waterways
Tributaries to South Fork Trinity River
Township
5N
Range
6E
Section
14
Base
HB&M
Other Location Info
Willow Creek

Notice of Determination

Approving Agency
County of Humboldt
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print