Fortuna Dump Remediation Project
2 Documents in Project
Summary
SCH Number
2013032064
Lead Agency
California Department of Resources Recycling and Recovery
Document Title
Fortuna Dump Remediation Project
Document Type
NOD - Notice of Determination
Received
Posted
7/24/2013
Present Land Use
County of Humboldt General Plan designation: Agriculture and Suburban; it's zoned Residential Suburban (RS)
Document Description
The project site is approximately 9-acres with the inactive burn dump area covering 5.6 acres. The project proposes re-grading the 5.6-acre burn dump area and increasing the size of the burn dump area to a total of six acres. The project impact area would be capped with up to two-feet of soil or approximately 11,000 CY of imported soil. Debris that is located adjacent to Mill Creek would be relocated within the project impact area and a 30-foot buffer created between the edge of the cap and Mill Creek. Gabions and soil berms would be constructed to reduce the potential for soil cap erosion and possible contamination to the creek. A new drainage pattern would be created diverting the flow of water to the perimeter of the soil cap. A vegetative cover of native grasses and small shrubs would be established to help limit erosion. No operational uses are proposed.
Contact Information
Name
Mustafe Botan
Agency Name
California Department of Resources Recycling and Recovery
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Fortuna
Counties
Humboldt
Cross Streets
Mill Street and Pinecrest Drive
Zip
95540
Total Acres
9
Parcel #
202-321-13
State Highways
US Route 101
Airports
Rohnerville Airport
Schools
Toddy Thomas ES
Waterways
Mill Creek and Eel River
Township
2N
Range
1E
Section
7
Notice of Determination
Approving Agency
CA Resources Recycling & Recovery
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.