Emerald Necklace Implementation Plan - Phase I
3 Documents in Project
Summary
SCH Number
2013031056
Lead Agency
Watershed Conservation Authority
Document Title
Emerald Necklace Implementation Plan - Phase I
Document Type
EIR - Draft EIR
Received
Present Land Use
Multi-jurisdictional
Document Description
The Emerald Necklace is a 17-mile interconnected network of bikeways, multi-use trails, parks, and greenways along the San Gabriel River and the Rio Hondo. The Emerald Necklace Implementation Plan Phase I includes sixteen projects that would close gaps in the trails network and increase access to people in the project area. The projects are located in four general areas along the Emerald Necklace which include the Quarry Clasp, Whittier Narrows, San Jose Creek, and Westside. The Quarry Clasp includes four projects (Projects 1-4) that would close the trail loop at the northern point of the necklace by connecting the San Gabriel River and the Rio Hondo. The Whittier Narrows area includes five projects (Projects 5-9) that would connect the Emerald Necklace Trail to the Whittier Narrows park resources at the southern side of the trail loop. These five projects would improve circulation in the Whittier Narrows area allowing access to pedestrians and bicyclists to all park areas currently inaccessible without a car. The San Jose Creek area would include two projects (projects 10 and 11) that would improve access to the Emerald Necklace for the communitieis on the east side of the San Gabriel River. The Westside area would include five projects (projects 12-16) that would create a continuous loop around the Emerald Necklace for equestrians and improved recreational potential for all user groups. Projects 12-16 would also improve access to the Emerald Necklace for the communities on the west side of the Rio Hondo.
Contact Information
Name
Rob Romanek
Agency Name
Watershed Conservation Authority
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Los Angeles
Cross Streets
Valley Blvd., Garvey Avenue, Lower Azusa Road, Peck Road, Durfee Avenue
Zip
91732
Parcel #
Multi-jurisdictional
State Highways
I-10, I-605, SR-60
Railways
UPRR
Airports
El Monte Airport
Schools
multiple schools
Waterways
San Gabriel River, Rio Hondo, San Jose Creek
Township
1S
Range
11W
Section
20
Base
SBB&M
Other Location Info
14 cities
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Parks and Recreation, California Highway Patrol, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), Caltrans, Division of Aeronautics, Department of Water Resources, Resources Agency, California Native American Heritage Commission (NAHC), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Transportation, District 7 (DOT)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Transportation, District 7 (DOT)
Development Types
Recreational (multi-use trails, bridges, park)
Local Actions
Other
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation, Vegetation, Wetland/Riparian
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.