Sunset Upper Debris Basin Dam Modification
2 Documents in Project
Summary
SCH Number
2013031018
Lead Agency
Los Angeles County Flood Control District
Document Title
Sunset Upper Debris Basin Dam Modification
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Sunset Upper Debris Basin Dam, constructed 1929; Open Space (OS) zoning; Mountain Reserve land use designation
Document Description
Note: Extended review.
The project would increase the height of the Sunset Upper concrete arch dam by a maximum of 5 feet on top of the existing dam. The existing access road crossing the southern end of the dam would be raised by varying amounts up to 4.8 feet to match the increased dam elevation. The proposed project would provide an additional 8,000 cubic yards of storage capacity to Sunset Upper Debris Basin. Increasing the debris basin capacity would expand the 100% and 25% capacity contact lines, by 9,002 sf and 3,279 sf, respectively.
Contact Information
Name
Grace Yu
Agency Name
Los Angeles County Flood Control District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Burbank
Counties
Los Angeles
Cross Streets
Northern terminus of Country Club Drive
Zip
91501
Total Acres
2.56
Parcel #
5608-005-901
State Highways
I-5
Township
1
Range
13
Section
6
Base
SBB&M
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Public Health (CDPH), California Department of Transportation, District 7 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California State Lands Commission (SLC), Resources Agency, State Water Resources Control Board, Division of Water Rights, Department of Water Resources
State Reviewing Agency Comments
Department of Water Resources
Development Types
Other (Flood Control Dam Improvement 8,000 cy debris basin capacity inc)
Local Actions
Infrastructure Improvement
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, GHGE
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.