Proposition 84 - Planning Study for Water System Upgrade
Summary
SCH Number
2013018180
Public Agency
Caliente Union School District
Document Title
Proposition 84 - Planning Study for Water System Upgrade
Document Type
NOE - Notice of Exemption
Received
Posted
1/25/2013
Document Description
The purpose of the planning study is to investigate the feasibility of drilling wells that meet the fluoride MCL and, if necessary, determine the most beneficial method of arsenic treatment. The intent of the planning is to prepare the necessary engineering design elements and drill test wells such that Plute School will be ready to proceed to a SRF Construction project that can be considered "shovel ready". The planning scope will also include hydrogeological investigation, surveying, plans and specifications, environmental documentation, and aplicaiton for funds. The project will provide reliable water supply and water quality meeting the Fluoride drinking water standards.
Contact Information
Name
Kathleen Hansen
Agency Name
Caliente Union School District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Kern
Notice of Exemption
Exempt Status
Statutory Exemption
Type, Section or Code
15262
Reasons for Exemption
Planning Phase of Title 22 Project
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.