Pioneer Bluff Bridge

8 Documents in Project

Summary

SCH Number
2013012030
Lead Agency
City of West Sacramento
Document Title
Pioneer Bluff Bridge
Document Type
NOD - Notice of Determination
Received
Posted
6/6/2013
Present Land Use
Arterial Roadway, Waterfront (WF), Recreations and Parks (RP)
Document Description
This proposed project involves the construction of a bridge connecting the existing two-lane South River Road on the north side of the barge canal to the South River Road on the south side of the barge canal. The project will provide a necessary alternative to north-south traffic and relieve congestion on Jefferson Boulevard. The bridge will include one 12-foot lane in each direction, one future 12-foot lane in each direction, a 2-foot raised median, shoulders, and two 6-foot walkways separated from traffic by a concrete barrier. The CA Dept. of Fish and Wildlife is executing a Lake and Streambed Alteration Agreement Number 1600-2013-0024-03 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, the City of West Sacramento.

Contact Information

Name
Phillip Poirier
Agency Name
CA DFW
Contact Types
Lead/Public Agency

Location

Cities
West Sacramento
Counties
Yolo
Cross Streets
South River Road and Barge Canal
Zip
95691
Total Acres
5
Parcel #
0671800010
State Highways
I-5, 50, SR-99, 275
Railways
UPRR
Airports
Sacramento Executive
Schools
Stonegate ES
Waterways
Sacramento River Deep Water Ship Channel
Township
8N
Range
4E
Base
MDB&M

Notice of Determination

Approving Agency
CA Dept. of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print