Former Hollister Manufactured Gas Plant - Feasibility Study/Remedial Action Plan
2 Documents in Project
Summary
SCH Number
2013012018
Lead Agency
Department of Toxic Substances Control
Document Title
Former Hollister Manufactured Gas Plant - Feasibility Study/Remedial Action Plan
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2013
Present Land Use
Commercial/residential
Document Description
DTSC is considering approval of a Feasibility Study/Remedial Action Plan (FS/RAP) for the former Hollister Manufactured Gas Plant (MGP) Site (hereafter "the Site") pursuant to Health & Safety Code, Division 20, Chapter 6.8 as submitted in January 2013 by AMEC Environment & Infrastructure, Inc. on behalf of Pacific Gas and Electric Company (PG&E). The proposed remedy, hereafter referred to as "the proposed project", includes soil removal to address soil contaminants at the Site, including polycyclic aromatic hydrocarbons (PAHs), arsenic, lead, pentachlorophenol, and gasoline-related volatile organic compounds (VOCs). Remedial activities at the Site are to be performed by PG&E and are expected to begin in the summer 2013. The proposed project includes soil removal within the PG&E property (currently used as the PG&E Service Center) and along two sidewalks immediately adjacent to the PG&E property. The excavated soil will be transported offsite for disposal at appropriate permitted landfill facilities.
Contact Information
Name
Henry Chui
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
Sixth and Sally Streets
Zip
95023
Total Acres
1.2
Parcel #
54-031-1, -3
State Highways
Hwy 25, 156
Railways
No
Airports
Hollister
Schools
Various
Waterways
No
Notice of Determination
Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.