Lake or Streambed Alteration Agreement No. 1600-2016-0119-R1
3 Documents in Project
Summary
SCH Number
2013012013
Lead Agency
Siskiyou County
Document Title
Lake or Streambed Alteration Agreement No. 1600-2016-0119-R1
Document Type
NOD - Notice of Determination
Received
Posted
7/6/2016
Present Land Use
AG-1 (Prime Agricultural District)
Document Description
Project is limited to replacement of a deficient crossing structure at Schulmeyer Gulch and Old Hwy 99. The current structure is a concrete triple box culvert that measures 23 feet long and 31.75 feet wide. Work will consist of removing the existing structure with a backhoe or excavator and replacing the structure with a single-span concrete slab bridge on concrete abutments and driven steel piles in the same location. Approx. 143 cubic yards of standard rock slope protection will be placed around the concrete abutments both above and below the ordinary high water mark, as well as along 40' of streambank, to prevent scouring. A temporary traffic detour will be provided adjacent to the work area, but upstream of the crossing, and will consist of a ford-type structure, grading the existing channel and banks so that the crossing will be 24' wide and 3' deep. Base rock will be placed on top of a 3" layer of straw or geotextile fabric to delineate fill material. Once the new bridge has been built, the detour will be removed, all imported fill removed from the channel, ant he banks will be contoured to meet pre-project elevations and contours. Disturbed slopes will be seeded with a weed-free native seed grass mix.
Contact Information
Name
Kate Grossman
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Counties
Siskiyou
Cross Streets
Old Hwy 99 at Schulmeyer Gulch
Zip
96097
Total Acres
.25
Parcel #
038-070-120
State Highways
I-5
Waterways
Schulmeyer Gulch
Township
44N
Range
6W
Section
19
Base
MDB&M
Other Location Info
Schulmeyer Gulch
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.