Pomona High School Track & Field Renovation
2 Documents in Project
Summary
SCH Number
2013011039
Lead Agency
Pomona Unified School District
Document Title
Pomona High School Track & Field Renovation
Document Type
NOD - Notice of Determination
Received
Posted
4/4/2013
Present Land Use
High School : Institutional - High School: Publicly Owned Land (O)
Document Description
The District proposes to switch the locations of the track and football field with the varsity softball/soccer field. The new track and football field would include a synthetic AstroTurf and a 400-meter, nine-lane, all-weather, synthetic rubberized running track. The field would be painted for both football and soccer uses. Home and visitor aluminum bleachers would be installed for a total of 1,498 spectator seats, an increase of 698 seats. Four new light poles with speakers would be installed for nighttime use of the facility. The new softball field would be reseeded for natural turf and would include a 30-foot backstop and dugouts. A sprinkler system would be installed to irrigate the landscaped areas, as well as to cool down the synthetic track and field. The proposed project would include a new concession/restroom building and a new stormwater drainage system. Runoff from impervious areas of the project site would be collected in subsurface pipes.
Contact Information
Name
Nathaniel Holt
Agency Name
Pomona Unified School District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Pomona
Counties
Los Angeles
Cross Streets
Towne Avenue and Bangor Street
Zip
91767
Total Acres
10
Parcel #
8365-002-901
State Highways
I-10
Railways
Metro; UPRR/Metrolink
Airports
Brackett Field
Schools
9 ES; 3 MS; 1 Charter; 3 Pri./Paro
Waterways
Thompson Creek, Live Oak Wash, San Antonio Channel
Township
1S
Range
8W
Section
17
Base
SBB&M
Notice of Determination
Approving Agency
Pomona Unified School District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.