Fire Mountain Lodge Hydroelectric Project
3 Documents in Project
Summary
SCH Number
2012122009
Lead Agency
State Water Resources Control Board
Document Title
Fire Mountain Lodge Hydroelectric Project
Document Type
NOD - Notice of Determination
Received
Posted
9/27/2013
Present Land Use
Unclassified
Document Description
The project is comprised of two elements: (1) relicensing the existing Fire Mountain Lodge Hydroelectric Project; and (2) dam safety repairs required by FERC's Division of Dam Safety and Inspections. The Fire Mountain Lodge Hydroelectric Project's license expired on April 30, 2010, and currently operates under annual licenses as the Fire Mountain Lodge Hydroelectric Project undergoes relicensing by FERC. The Fire Mountain Lodge Hydroelectric Project consists of a small existing earth and concrete filled dam, reservoir, penstock, intake tower, powerhouse, and transmission line. The project requires a Clean Water Act, Section 401 water quality certification from the State Water Resources Control Board (State Water Board). Conditions of the water quality certification for the Project include stabilization of the adjacent unpaved road to reduce erosion, installation of flow measurement devices, and minimum streamflow requirements.
Contact Information
Name
Michelle Lobo
Agency Name
State Water Resources Control Board, Div. of Water Rights
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Tehama
Cross Streets
43500 California State Highway 36
Zip
96061
Total Acres
1.55
Parcel #
017-220-14, 017-220-11, 220-10
State Highways
Hwy 89/36
Railways
No
Airports
No
Schools
No
Waterways
Unnamed Tributary
Township
28N
Range
5E
Section
10
Base
MDB&M
Other Location Info
City/Nearest Community: Mill Creek
Notice of Determination
Approving Agency
SWRB
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.